Things are moving along really quickly with the renovation. Looks like all the plumbing basics are now in. The big walk-in shower in the ensuite bath has been framed and is now ready to be tiled.
The new valves for the shower in the second bathroom are installed.
The framing for the tub surround in the ensuite is completed and the big new soaker tub has been delivered.
I guess some people may not find plumbing the most exciting thing in the world, but for me it's all about knowing the basics are in and that the really fun stuff is about to begin. The tile supplier prepared a gorgeous tile design for the two showers and the tub surround, with a mosaic listello accent [listello was a new word for me too!....it means a tile border]. I'm so looking forward to actually seeing it.
Next up, we'll be checking in on the exterior painting.
website: http://www.theretreatbythelake.com/
No comments:
Post a Comment